Bids
View Press Alt Down to open filter Menu | ESBD Solicitation Name Press Enter to sort. Press Alt Down to open filter Menu | Solicitation Type Press Enter to sort. Press Alt Down to open filter Menu | Project Description/SOW Press Enter to sort. Press Alt Down to open filter Menu | Employee Contact Press Enter to sort. Press Alt Down to open filter Menu | Issue Date Press Enter to sort. Press Alt Down to open filter Menu | Bid Due Date Press Enter to sort. Press Alt Down to open filter Menu | Contract Start Date Press Enter to sort. Press Alt Down to open filter Menu |
|---|
View | 1111789 Utility Improvements at Hueco Tanks State Park & Historic Site | IFB | Furnish all labor, equipment, tools, materials and incidentals necessary including but not furnished to drill two new potable water wells which include one new replacement adjacent to the existing water well, connecting it to the exciting water and electric system, one new water well ready for connection to the exiting water and electrical system at a later date and then plug and abandoned two old water wells. | Hernandez, JoAnn | 06/05/2026 01:00 PM | 06/26/2026 02:00 PM | |
View | PS11992 Stewart and Ranch House Repairs | IFB | The remodel and repairs of the Stewart and Ranch Houses including, removal of existing furnishings and kitchen cabinetry, crawlspace insulation removal and installation, flooring repairs and replacement, wood siding repairs, structural fastener repairs, window replacement, shutter installation, interior finish replacement and repairs, door and hardware replacement and repairs, painting, HVAC replacement, and plumbing. | Rahman, Fahim | 06/18/2026 12:00 AM | 07/22/2026 02:00 PM | 09/10/2026 |
View | MR12735 Green Flush Restroom at Galveston Island State Park | IFB | furnish and install a Green Flush Restroom and concrete walkway at Galveston Island State Park. | Habermann, Anthony | 05/29/2026 12:00 AM | 07/22/2026 02:00 PM | |
View | 1211815 Trail Bridge Replacements at Lake Somerville State Park & Trailway | RFP | remove the remnants of the existing wooden bridges and concrete abutments at Nails Creek and Yegua Creek and replace with new structural steel bridges with concrete foundations, and provide new bridge approaches. The projects includes partial creek bank restoration immediately up and down stream of the proposed bridges with limited riprap stabilization at abutments. | Sandoval, Lyndsi | 05/26/2026 04:00 PM | 08/11/2026 02:00 PM | |
View | 1112552 Centennial Park Development - Phase 2 at Post Oak Ridge State Park | RFP | The scope of this project includes pre-construction services and construction of the new park development for Post Oak Ridge State Park. | Holcomb, Mandy | 05/05/2026 12:00 AM | 06/30/2026 02:00 PM | 11/11/2026 |
View | MR12387 Replace Two Residential Septic Systems at Mother Neff State Park | IFB | Remove and Replace Two Residential Septic Systems | Wyatt, Misty | 05/06/2026 11:00 AM | 06/23/2026 02:00 PM | |
View | 1112732 (previously CR11697R) Hodges Barn Historical Restoration at Lyndon B. Johnson State Park | IFB | restoration of the historic Hodges Barn to plumb and square with new 2nd floor support posts in concrete piers, using existing materials where possible or replacing with matching reclaimed materials. | Chupka, Nicole | 07/01/2026 01:00 PM | 08/06/2026 02:00 PM | |
View | 1112549 Centennial Project - North Rock Initial Public Day Use Enchanted Rock State Natural Area | RFP | property improvements to create functional access for Public Day Use visitors, including new gated access point, ranch road widening, a new parking loop and trailhead with various site amenities, and minor drainage and wayfinding improvements to two-track ranch roads converted to new hiking trails. | Johnson, Mindi | 03/16/2026 04:00 PM | 05/14/2026 02:00 PM | |
View | MR12323 Replace Water Line at Caddo Lake State Park | IFB | Replacement of water line between Maintenance Shop and the Campground area | Wyatt, Misty | 02/18/2026 04:00 PM | 04/07/2026 02:00 PM | |
View | 1510000 Texas Parks and Wildlife - Austin HQ Building Repairs, Upgrades and Modernization | RFQ | Provide the assessments, investigations, and design work required by all consultants to prepare the Program, Continued Operations plan, Phasing plan and Bid documents for all project phases, to coordinate change management, assist in the bid process (CSP or CMAR) and provide CA services through the life of the project. | Hernandez, JoAnn | 02/12/2026 05:00 PM | 04/02/2026 02:00 PM | 07/26/2026 |
View | 1212568 Pond Liner Replacement at Texas Freshwater Fisheries Center | RFP | removal and replacement of geomembrane liners in 45 ponds and install underdrains in 35 ponds | Sandoval, Lyndsi | 01/21/2026 12:00 AM | 03/17/2026 02:00 PM | 05/11/2026 |
View | 1112686 Air Handling Unit (AHU) Replacement - Building A & C at Texas Parks and Wildlife Austin Headquarters (HQ) | RFP | The project generally includes the following: • Replace 7 existing air handling units (3 in A, 4 in C) at building A & C. The scope includes rework replacement of associated duct, hot water coils, dampers, piping, valves, electrical controls and other appurtenances. New AHU controllers shall operate under existing BACNET MS/TP system for base proposal. • Replace each existing variable volume damper with new VAV terminal units including rework/replacement of associated duct and controls. • Remove all existing 2nd floor plenum heaters and associated piping. • Remove a1 existing rooftop exhaust fan and cap the associated roof curb at building C. • A tab audit of the existing air handling units shall be performed before construction begins to establish a baseline comparison to post project system performance. • General contractor shall dismantle, relocate and reinstall office furniture, equipment, and other miscellaneous items within the designated equipment move-out/move 0 in pathways to provide clear access for construction. Proposal Alt 1 Replace (7) existing BACNET MS/TP AHU controllers (3 in A, 4 in C), with new BACNET IP controllers including associated wiring and configuration for a complete and operable system. | Hernandez, JoAnn | 01/14/2026 12:00 AM | 02/20/2026 02:00 PM | 06/18/2026 |
View | MR13119R Pool Pump Equipment Replacement at Abilene State Park | IFB | all labor, materials, equipment, tools, insurance, and supervision necessary to perform the removal, replacement, and installation of new pool pump equipment | Wyatt, Misty | 01/26/2026 02:00 PM | 03/17/2026 02:00 PM | |
View | 1112553, Centennial Program -New Park Development at Bear Creek State Park | RFP | Project develop a newly acquired 1,720.77-acre ranch tract in Uvalde County for a new Texas State Park. The acquired property is situated ten miles southeast of existing Garner State Park. The development will include but not be limited to constructing all park roads, paths, parking lots, utilities operating facilities, administrative buildings, trails, picnic areas, restrooms, campgrounds, cabins. The project will be constructed in two packages; each with a Pre-Construction Services component under the Construction Manager at-Risk method. | Chupka, Nicole | 01/07/2026 04:00 PM | 02/17/2026 02:00 PM | 05/13/2026 |
Items per page